9.6
Level error
Check the cable of the level monitoring visual and electrical. Find the error and replace the cable.
If there is no problem with the cable, the level monitoring is defective.
Exchange the reservoir cover with installed level monitoring.
9.6.1
Central lubrication pump FKGGM - EP
Exchange of cable:
Loosen the knurled nut from the angled plug of the level monitoring (figl. 81). Pull off the plug. Now put the new
cable on and tighten the knurled nut. The plug can only be put on in a certain position. Now connect the other end
as described under item 5.
Exchange of reservoir cover with installed level monitoring:
Loosen the knurled nut from the angled plug and pull off the plug. Unscrew the head nut of the tie rods and
disassemble the reservoir cover. The new cover with installed level monitoring can be installed now. Take care of
the monitoring position. Assemble the cover and tighten the head nuts on the tie rods. Put the angled plug onto
the level monitoring and tighten the knurled nut. The plug can only be put on in a certain position.
Fig. 81:
The cable connection of the reservoir with level monitoring must be done by professional
staff. We are not liable for damages or injuries due to improper assembly works.
After exchanging the cable or the reservoir with level monitoring, check the correct function of the pump.
Head nut
Reservoir cover with
installed level monitoring
Reservoir
Tie rod
63
Angled plug level
monitoring
Subject to alterations!
...a product from
BAL2076_central lubrication pump_01
19EN
© BEKA
2019 All rights reserved