DxC Integrated Workstation In-Lab Training Manual
Page 99 of 101
Rev. A (June 2014)
Beckman Coulter Professional Development
Daily Start
Up
10. Which icon would you use at the workstation console to print a
supply status for the entire system?
Rgts/Cal
11. Place a number before each task below indicating the
recommended order they should be performed as part of a
Daily Start Up:
5
Process Quality Control
1
Print/View Reagent, Calibration, and Supply Status
2
Perform Daily Maintenance
4
Calibrate required tests
3
Load Reagents and Supplies
12. The Daily Clean is requested at the
DxI
console, using the
Sample Manager
F1 menu.
13. If your lab processes the
Vitamin B12
assay you should run a
Special Clean instead of a Daily Clean.
14. What supplies are required for UCTA operation?
Wash Buffer
and
Auto-Gloss