DxC Integrated Workstation In-Lab Training Manual
Page 36 of 101
Rev. A (June 2014)
Beckman Coulter Professional Development
Daily Start Up
The following procedures are required for a daily start up of the DxC Integrated
Workstation. The order listed below is the most efficient way to complete the
procedures.
1. Determine integrated workstation supply and calibration status
2. Perform DxI daily maintenance
3. Replenish DxI supplies and reagents
4. Replenish UCTA supplies
5. Replenish DxC reagents
6. Calibrate DxC chemistries (as needed)
7. Calibrate DxI assays (as needed)
8. Process quality control
9. Clear manually assigned racks
Note: Verify the current daily start up procedures by referencing the latest
version of the DxC Integrated Workstation Instructions for Use (IFU) Manual and
the Important Notes for the IFU.
Flowchart Information
Perform the tasks in the order listed for efficiency
Some tasks may be performed on one component of the system while another
component is performing a different task. Multi-tasking reduces start up time
Some tasks may be performed at alternate times
(Example: DxI assays may be calibrated during off-peak hours)
All tasks may not be required each day
(Example: Not all assays need to be calibrated daily)
Colors are used to categorize groups of tasks