DxC Integrated Workstation In-Lab Training Manual
Page 93 of 101
Rev. A (June 2014)
Beckman Coulter Professional Development
Daily Start
Up
10. Which icon would you use at the workstation console to print a
supply status for the entire system? ___________________
11. Place a number before each task below indicating the
recommended order they should be performed as part of a
Daily Start Up:
_____ Process Quality Control
_____ Print/View Reagent, Calibration, and Supply Status
_____ Perform Daily Maintenance
_____ Calibrate required tests
_____ Load Reagents and Supplies
12. The Daily Clean is requested at the ____________ console,
using the ________________ F1 menu.
13. If your lab processes the ________ assay you should run a
Special Clean instead of a Daily Clean.
14. What supplies are required for UCTA operation?
__________________ and ___________________