DxC Integrated Workstation In-Lab Training Manual
Page 68 of 101
Rev. A (June 2014)
Beckman Coulter Professional Development
Shutdown the DxC Integrated Workstation
The DxC Integrated Workstation may require power down when:
Part replacement procedures specify power to be turned off
The lab power goes off
The system is moved to a new location, or
Recommended by a BCI specialist for troubleshooting
purposes
Avoid system errors by following these recommendations:
When one instrument component must be shut down, all
three components (DxI, UCTA, DxC) of the DxC Integrated
Workstation must be shut down
Components should not be powered down independently
Reboot is not recommended
The DxI and DxC can be shut down and restarted
simultaneously at their respective consoles
The DxI instrument must be shut down before the DxI PC
Use the flowcharts on the following pages to shut down and
restart the DxC Integrated Workstation.