DxC Integrated Workstation In-Lab Training Manual
Page 70 of 101
Rev. A (June 2014)
Beckman Coulter Professional Development
Restart the DxC Integrated Workstation
Restarting the DxI PC and Instrument
1. Verify that the upper main covers of the DxI instrument are closed
2. Turn on the instrument power switch behind the lower right door of the DxI
3. Restart the DxI PC. Press the DxI console power switch until the green LED light
comes on
4. Wait until the DxI console displays the DxI Main Menu
5. Verify the system mode returns to the Ready mode and no message is displayed in
the system mode area. Note that this may take several minutes
Restart the DxC
1. Turn on the power to the workstation console computer
2. Turn on the power switch behind the far right door of the DxC instrument
3. The DxC system status displays
Startup
during the boot-up routine, followed by
Homing
of all mechanisms
Restart the UCTA
1. Verify the DxI is in the
Ready
mode and the DxC is in
Standby
2. Turn the UCTA power switch to on ( | position)
3. Verify the UCTA status returns to
Standby
NOTE
Wait for the system to restore internal temperatures before
processing samples. This may take 15-20 minutes,
depending on the amount of time that power was off.
Resolve any errors before processing samples.