Using Model 5380 Ethernet and Model 5580 Token Ring Routers
C-4
112768 Rev. B
Site Manager Workstation Information
IP address of the workstation on which the Site Manager
software will be installed. This information is requested
when the installation is tested at the end of the procedure.
192.32.10.12
WAN Information
The following information about enabling Frame Relay, PPP, and SMDS from the installation script is for
experienced users only. Normally these protocols are implemented from Site Manager on an additional
interface.
Frame Relay Information
(To enable Frame Relay on a synchronous connector on this initial IP interface.)
Enable Frame Relay on the interface?
Yes
Management protocol that communicates with the Frame
Relay network.
LMI
DLCI addressing types.
ADDR Q.922
Frame Relay address field length.
2 bytes
Frame Relay PVC ID.
30
PPP Information
(To enable PPP on a synchronous connector on this initial IP interface)
Enable PPP on the interface?
Yes
IP address of peer connection.
192.32.4.2
Enable PPP Echo protocol?
Yes
Number of seconds between transmission of echo
requests.
10
Acceptable loss of Echo-Reply packets.
3
Enable local authentication protocol?
Yes
Chap Information
(To enable security for point-to-point router circuits)
Chap secret assigned to peer router
system2b
Chap secret assigned to the interface
system2b
(continued)
Table C-1.
Network Information Worksheet
(continued)
Requested Information
Example
Your Information
Summary of Contents for 5380
Page 8: ......
Page 16: ......
Page 22: ......
Page 28: ......
Page 52: ......
Page 111: ...Technical Specifications 112768 Rev B A 5 ...
Page 112: ...Using Model 5380 Ethernet and Model 5580 Token Ring Routers A 6 112768 Rev B ...
Page 122: ......
Page 138: ......