![Baxi LUNA HT 1.280 Installation, Operation And Maintenance Manual Download Page 3](http://html1.mh-extra.com/html/baxi/luna-ht-1-280/luna-ht-1-280_installation-operation-and-maintenance-manual_2711826003.webp)
7.3
Setting up heating operation................................................................................................................ 43
7.4
Setting up DHW operation................................................................................................................... 44
7.5
Setting room setpoint.......................................................................................................................... 44
7.6
Display information............................................................................................................................. 45
7.7
Error message..................................................................................................................................... 45
7.8
Servicing message............................................................................................................................... 46
7.9
Emergency mode (Manual control)........................................................................................................ 46
7.10 Restore standard values....................................................................................................................... 46
8.
Programming...................................................................................................................................... 47
8.1
Programming procedure...................................................................................................................... 47
8.2
Modification of parameters.................................................................................................................. 48
8.3
Setting table....................................................................................................................................... 50
8.4
Explanations for setting table............................................................................................................... 74
9.
Maintenance...................................................................................................................................... 124
9.1
Inspection and need dependent service................................................................................................. 124
9.2
Boiler view.......................................................................................................................................... 125
9.3
Disassembling and installing burner..................................................................................................... 127
9.4
Check and replacing Ignition electrode.................................................................................................. 129
9.5
Check and replacing ionisation electrode............................................................................................... 130
9.6
Electrode spacing and installation locations........................................................................................... 131
9.7
Clean burner pipe................................................................................................................................ 131
9.8
Clean heat exchanger.......................................................................................................................... 132
9.9
Clean fan............................................................................................................................................ 134
9.10 Control and regulating centre LMS........................................................................................................ 134
9.11 Fault switch-off................................................................................................................................... 135
9.12 Fault code table................................................................................................................................... 136
9.13 Maintenance code table....................................................................................................................... 139
9.14 Operation phases of control and regulation centre LMS.......................................................................... 139
358 436 08.10
3
Summary of Contents for LUNA HT 1.280
Page 1: ...Installation operation and maintenance manual Condensing gas boiler Power HT 1 230 1 280 1 320...
Page 8: ...2 6 Conformity declaration Safety 8 358 436 08 10...
Page 10: ...Technical Data 10 358 436 08 10...
Page 12: ...Technical Data 12 358 436 08 10...
Page 13: ...3 3 Wiring Diagram Fig 2 Wiring Diagram Technical Data 358 436 08 10 13...
Page 21: ...Before installation 358 436 08 10 21...
Page 23: ...Wiring plan Before installation 358 436 08 10 23...
Page 25: ...Wiring plan Before installation 358 436 08 10 25...
Page 27: ...Wiring plan Before installation 358 436 08 10 27...
Page 29: ...Wiring plan right EC three Before installation 358 436 08 10 29...
Page 30: ...Wiring plan left EC three Before installation 30 358 436 08 10...
Page 31: ...4 9 Legend Before installation 358 436 08 10 31...
Page 142: ...Space for notes 142 358 436 08 10...
Page 143: ...Space for notes 358 436 08 10 143...