![Baxi LUNA HT 1.280 Installation, Operation And Maintenance Manual Download Page 2](http://html1.mh-extra.com/html/baxi/luna-ht-1-280/luna-ht-1-280_installation-operation-and-maintenance-manual_2711826002.webp)
Table of contents
1.
Regarding this Manual.........................................................................................................................
4
1.1
Content of this manual........................................................................................................................
4
1.2
Overview table....................................................................................................................................
4
1.3
Used symbols......................................................................................................................................
5
1.4
For whom is this manual intended?.......................................................................................................
5
2.
Safety................................................................................................................................................
6
2.1
Usage according to purpose.................................................................................................................
6
2.2
General safety instructions...................................................................................................................
6
2.3
Regulations and standards...................................................................................................................
7
2.4
Liquid gas under ground.......................................................................................................................
7
2.5
CE-Marking.........................................................................................................................................
7
2.6
Conformity declaration........................................................................................................................
8
3.
Technical Data....................................................................................................................................
9
3.1
Dimensions and connections................................................................................................................
9
3.2
Technical Data.................................................................................................................................... 11
3.3
Wiring Diagram................................................................................................................................... 13
3.4
Sensor value tables.............................................................................................................................. 14
4.
Before installation............................................................................................................................... 15
4.1
Inlet and outlet air openings................................................................................................................. 15
4.2
Converting the exhaust and supply air connection.................................................................................. 15
4.3
Corrosion protection............................................................................................................................ 17
4.4
Requirements for heating circuit water................................................................................................. 17
4.5
Notes for installation location.............................................................................................................. 18
4.6
Space requirement.............................................................................................................................. 19
4.7
Transportation.................................................................................................................................... 20
4.8
Application examples.......................................................................................................................... 22
4.9
Legend............................................................................................................................................... 31
5.
Installation......................................................................................................................................... 32
5.1
Connect heating circuit........................................................................................................................ 32
5.2
Condensated water connection............................................................................................................ 32
5.3
Sealing and filling of the plant.............................................................................................................. 32
5.4
Flue system......................................................................................................................................... 32
5.5
Gas connection................................................................................................................................... 33
5.6
Check tightness................................................................................................................................... 34
5.7
Factory settings................................................................................................................................... 34
5.8
CO2 -Content...................................................................................................................................... 34
5.9
Changing over from LPG to natural gas and vice versa............................................................................. 34
5.10 Controller Stop Mode (Manual Adjustment of Burner Load)..................................................................... 36
5.11 Check and adjust CO2 content.............................................................................................................. 37
5.12 Electrical connection (general).............................................................................................................. 38
6.
Commissioning................................................................................................................................... 40
6.1
Check water pressure........................................................................................................................... 40
6.2
Switching-on...................................................................................................................................... 40
6.3
Temperatures for heating and drinking water........................................................................................ 41
6.4
Individual time programme.................................................................................................................. 41
6.5
Instruction for the customer................................................................................................................. 41
7.
Operation........................................................................................................................................... 42
7.1
Operating elements............................................................................................................................. 42
7.2
Displays.............................................................................................................................................. 43
2
358 436 08.10
Summary of Contents for LUNA HT 1.280
Page 1: ...Installation operation and maintenance manual Condensing gas boiler Power HT 1 230 1 280 1 320...
Page 8: ...2 6 Conformity declaration Safety 8 358 436 08 10...
Page 10: ...Technical Data 10 358 436 08 10...
Page 12: ...Technical Data 12 358 436 08 10...
Page 13: ...3 3 Wiring Diagram Fig 2 Wiring Diagram Technical Data 358 436 08 10 13...
Page 21: ...Before installation 358 436 08 10 21...
Page 23: ...Wiring plan Before installation 358 436 08 10 23...
Page 25: ...Wiring plan Before installation 358 436 08 10 25...
Page 27: ...Wiring plan Before installation 358 436 08 10 27...
Page 29: ...Wiring plan right EC three Before installation 358 436 08 10 29...
Page 30: ...Wiring plan left EC three Before installation 30 358 436 08 10...
Page 31: ...4 9 Legend Before installation 358 436 08 10 31...
Page 142: ...Space for notes 142 358 436 08 10...
Page 143: ...Space for notes 358 436 08 10 143...