3. Installation process
3. INSTALLATION PROCESS
About the installation process
The installation of the complete system is split up in two parts, installation of the projector and the installation of the cooling unit
(standalone pack).
Overview
•
Installation process projector
•
Installation process stand alone cooler
•
Starting up and adjusting the system
3.1
Installation process projector
Check if all installation requirements are ful
fi
lled such as the environment conditions of the installation area,
electrical facilities, etc. For more info see topic "Installation requirements", page 17.
Installation process from A to Z
The following steps describe brie
fl
y how to setup your HDF WLP series projector in a table mount front projection. Note that each
step refers to a corresponding procedure, which is more detailed and illustrated.
1. Install the batteries of the remote control. See "Remote control unit (RCU)", page 33.
2. Place the projector on a solid table in front of the screen at the expected throw distance. Ensure that the projector is installed at
right angles (horizontally and vertically) with the screen. See "Projector con
3. Install the external stand alone cooler. To obtain an overview of the procedure, please see section bellow "Installation process
stand alone cooler", page 27. For more details refer to the complete description in chapter "Physical installation stand alone
cooler", page 37.
4. Select and install an appropriate lens, which covers the throw ratio ( = screen size / projector screen distance). See "Lenses",
5. Connect the projector with the local power net. See "Power connection", page 29.
6. Connect your source to the appropriate input module. See "Input source connections", page 68
7. Update the software with the last version available on the Barco website. See "Software upgrade", page 87.
3.2
Installation process stand alone cooler
Installation process from A to Z
1.
Assembling
of the cooling
box housing
. The housing is delivered as a
fl
at pack and should be assemble during the installation
process.
2.
Mounting of the cooler housing
on its support.
3.
Mounting the empty cooler assembly
on the stand alone frame.
4.
Insert the cooler units
and
fi
lters.
5. Establish the
hose connections
(4x) between the cooler and the projector. Connect also the four
cables
.
R5906730 HDF WLP SERIES 01/08/2017
27
Summary of Contents for HDF-W30LP
Page 1: ...HDF WLP series User and Installation manual R5906730 05 01 08 2017...
Page 4: ......
Page 10: ...Table of contents 6 R5906730 HDF WLP SERIES 01 08 2017...
Page 78: ...8 Input Communication 74 R5906730 HDF WLP SERIES 01 08 2017...
Page 90: ...9 Getting started 86 R5906730 HDF WLP SERIES 01 08 2017...
Page 94: ...10 Software upgrade Image 10 5 90 R5906730 HDF WLP SERIES 01 08 2017...
Page 95: ...10 Software upgrade Image 10 6 R5906730 HDF WLP SERIES 01 08 2017 91...
Page 98: ...10 Software upgrade Image 10 11 94 R5906730 HDF WLP SERIES 01 08 2017...
Page 99: ...10 Software upgrade Image 10 12 R5906730 HDF WLP SERIES 01 08 2017 95...
Page 100: ...10 Software upgrade Image 10 13 10 Clear the history log 96 R5906730 HDF WLP SERIES 01 08 2017...
Page 108: ...11 Quick set up adjustment 104 R5906730 HDF WLP SERIES 01 08 2017...
Page 172: ...15 Layout 168 R5906730 HDF WLP SERIES 01 08 2017...
Page 224: ...17 Alignment 220 R5906730 HDF WLP SERIES 01 08 2017...
Page 258: ...18 Projector Control 254 R5906730 HDF WLP SERIES 01 08 2017...
Page 272: ...19 Service 268 R5906730 HDF WLP SERIES 01 08 2017...
Page 282: ...21 Maintenance procedures 278 R5906730 HDF WLP SERIES 01 08 2017...
Page 300: ...C Standard source files 296 R5906730 HDF WLP SERIES 01 08 2017...
Page 304: ...D DMX chart 300 R5906730 HDF WLP SERIES 01 08 2017...
Page 310: ...E Stacking HDF WLP series projectors 306 R5906730 HDF WLP SERIES 01 08 2017...