16
Loading the Fastener into the Module’s Feed System
ü
With the staple loaded to the Module Assembly per the previous chapter:
Air Supply should be ON
1. Cut the staple chain rails just below one rung on the staple chain.
2. Insert one side of the staple chain into the opening in the feed system.
3. Insert the other side of the staple chain into the other opening in the feed system.
4. Push one side of the staple chain down until bottom rung engages the anti-back
5. Push other side also down until the bottom rung is also engaged with the anti-back
•
Both sides of the staple chain should be aligned.
6. Holding the staple chain with both hands, pull up gently to ensure that the chain is
engaged with the feed.
•
Both sides of the staple chain should be aligned.
7. Cycle machine a few times to verify proper cutting and feeding.
Feed System
openings
Cutting the chain
before loading
Staple chain
Rungs
Rails
1
Anti-
backs
Module’s Feed System description
Summary of Contents for IndES Elastic Staple 11600-0
Page 14: ...12 2 Needle Guard Needle Brush Block 3 Adjust LMS Stop 4 Tighten Screw...
Page 17: ...15 Staple Loading Diagram from the Reel to the Module Assembly 3 2 1 2 3 4 5 6 7...
Page 19: ...17 2 3 4 5 6 7 Aligned...
Page 29: ...27 Feed Assembly screws on back of Module Front Linkage Cover Side Cover Feed Assembly 2 3...
Page 37: ...35 Handle Assembly...
Page 38: ...36 Handle Assembly...
Page 41: ...39 Right Module Assembly...
Page 43: ...41 Right Drive Linkage Assembly...
Page 44: ...42 Right Drive Linkage Assembly...
Page 45: ...43 Right Feed Assembly...
Page 49: ...47 Left Module Assembly...
Page 51: ...49 Left Drive Linkage Assembly...
Page 52: ...50 Left Drive Linkage Assembly...
Page 53: ...51 Left Feed Assembly...