![Avaya callpilot 1002rp Maintenance And Diagnostics Download Page 80](http://html1.mh-extra.com/html/avaya/callpilot-1002rp/callpilot-1002rp_maintenance-and-diagnostics_3028038080.webp)
Requirements
Before you hot-swap a power supply, gather the following tools:
• one flat-blade screwdriver
• one Phillips screwdriver
• one antistatic wrist strap
• the replacement power supply
When to hot-swap the power supply
A green LED indicates that the power supply is working properly. If the green LED on the power
supply module is unlit or red, the module is failing or has failed. Other indicators of failure
are the alarm that sounds and the power supply module LED on the status display that turns
red.
To hot-swap a power supply
1.
Voltage:
Risk of electric shock
High current inside the chassis can cause severe injury.
Loosen the thumbscrews at the top right and left of the failed power supply module
(see A in the following diagram).
If needed, use a flat-blade screwdriver. The thumbscrew must rotate freely and not
contact the chassis threads.
Replacing basic chassis components
80 Avaya CallPilot® 1002rp Server Maintenance and Diagnostics
December 2010
Summary of Contents for callpilot 1002rp
Page 1: ...Avaya CallPilot 1002rp Server Maintenance and Diagnostics 5 0 NN44200 701 01 05 December 2010 ...
Page 4: ...4 Avaya CallPilot 1002rp Server Maintenance and Diagnostics December 2010 ...
Page 10: ...10 Avaya CallPilot 1002rp Server Maintenance and Diagnostics December 2010 ...
Page 18: ...About this guide 18 Avaya CallPilot 1002rp Server Maintenance and Diagnostics December 2010 ...
Page 118: ...RAID operations 118 Avaya CallPilot 1002rp Server Maintenance and Diagnostics December 2010 ...