SAFETY AND MAINTENANCE MANUAL
1NO0024UK-09
35
S
S
S
e
e
e
c
c
c
t
t
t
i
i
i
o
o
o
n
n
n
4
4
4
.
.
.
R
R
R
U
U
U
L
L
L
I
I
I
N
N
N
G
G
G
4.1. CHECKING DURING THE FIRST OPERATION
- Compliance with the Order dated 1
st
March 2004 (France).
- New apparatus, this verification is made by ATN (according to the standards in force)
- This initial verification is valid for 6 months.
4.2. PERIODIC VERIFICATIONS IN FRANCE
- Compliance with the Order dated 1
st
March 2004(France).
- Every 6 months, the aerial work platform must be controlled by an accredited body.
- This verification consists of:
- the examination of the state of conservation
- the running tests:
*brakes
*devices controlling the lowering of the basket
*all the emergency and safety devices (incline, overload...)
4.3. SUITABILITY
Never forget to check before starting to use the aerial work platform that the machine be suitably
adapted to the site. This must be carried out by the user or his manager.
Summary of Contents for PIAF 1000R
Page 2: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 2 DISTRIBUTOR STAMP...
Page 8: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 8...
Page 11: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 11 Chapter I USE AND SAFETY...
Page 12: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 12...
Page 16: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 16...
Page 22: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 22...
Page 34: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 34...
Page 36: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 36...
Page 37: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 37 Chapter II MAINTENANCE...
Page 38: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 38...
Page 77: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 77 3 13 ELECTRICAL DIAGRAM Diagram ref 1EL0023 01...
Page 78: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 78 NOTES...