Procedure
Step
Action
1
Open the air outlet valve (customer's installation).
2
Switch on the voltage and check that voltage on LED (8) lights up.
3
Press start button (14). The compressor starts running in unloaded condition and
automatic operation LED (7) lights up.
4
Approx. 25 seconds later (programmable), the compressor starts running loaded.
5
On ZR compressors, regulate the water flow with the compressor running loaded and
the thermostatic valve completely open (the latter is valid for energy recovery units). The
aim is to obtain a cooling water temperature rise over the complete compressor unit of
15 K (in case of Pack compressors) and 10 K (in case of Full-Feature compressors). In
case of Full-Feature compressors, also the water flow over the integrated dryer is to be
regulated: a cooling water temperature rise over the dryer of 5 K is to be achieved. For
compressors without energy recovery, this is done by using the ball valve (1) inside the
compressor.
For compressors with energy recovery, a separate fresh cooling water circuit over the
dryer is foreseen and to be regulated to 5 K.
Instruction book
268
2920 1815 04
Summary of Contents for ZR 110
Page 2: ......
Page 179: ...Dimension drawing of ZT 110 up to ZT 145 page 1 Instruction book 2920 1815 04 177 ...
Page 214: ... CORRECT installation Instruction book 212 2920 1815 04 ...
Page 249: ...Electric cabinet of compressor with starter Model year 2014 Instruction book 2920 1815 04 247 ...
Page 326: ......
Page 327: ......