ANDREWS COMBIfl o
19
GB
4.0 INSTALLATION
4.1 SPLITTING THE APPLIANCE
1. Remove LH front door - disconnecting earth tab before removing.
2. Remove RH front door - disconnect the electrical loom, and remove from 2
cable retaining clips before removing.
3. Disconnect tank sensor electrical loom.
4. Close tank isolation valves at high and low level.
5. Disconnect tank compression couplers at high and low level on stainless steel
(tank) side of the coupler, leaving couplers attached to copper pipework. (BE-
WARE: Water may still be present in pipework and leak whilst disconnecting)
Remove 6 connection plates, (3 on front & 3 on back).
6. Unit can now be pulled apart.
7. Re-assembly is the reverse of above. Remember to open any isolation valves
you have closed.
SPLIT UNIT WEIGHT & DIMENSIONS
LH HEATER SECTION
RH TANK SECTION
100 Weight = 175 kg 150 Weight = 205 kg
100 Weight = 85 kg 150 Weight = 85 kg
1090mm(L) x 655mm(W) x 1950mm(H)
600mm(L) x 600mm(W) x 1950mm(H)
If required, the COMBIfl o can temporarily be separated (split) into two parts, manoeuvred and then re-
assembled. Refer to instructions below.
1
2
3
6
5
4
5
7
4
Summary of Contents for COMBIflo 100/300
Page 9: ...ANDREWS COMBIflo 7 GB 3 1 GENERAL DIMENSIONS CONNECTIONS 3 0 TECHNICAL DATA ...
Page 12: ...ANDREWS COMBIflo 10 GB 3 4 APPLICATION EXAMPLES Single Heating Circuit Simple ...
Page 13: ...ANDREWS COMBIflo 11 GB Single Heating Circuit Immersion DHW Circulation pump ...
Page 16: ...ANDREWS COMBIflo 14 GB Heating Circuit External 0 10V control ...
Page 17: ...ANDREWS COMBIflo 15 GB BMS INTERNET CONNECTIONS ...
Page 18: ...ANDREWS COMBIflo 16 GB 3 5 WIRING DIAGRAMS PCB 1 ...
Page 19: ...ANDREWS COMBIflo 17 GB PCB 2 3 ...