![andrews COMBIflo 100/300 Installation, Operation And Maintenance Manual Download Page 60](http://html1.mh-extra.com/html/andrews/combiflo-100-300/combiflo-100-300_installation-operation-and-maintenance-manual_2942787060.webp)
ANDREWS COMBIfl o
58
GB
6.2.10 GAS VALVE
• Carefully remove the electrical connector.
• Release the gas cock by undoing the four bolts holding it onto the gas valve.
• Remove the off set tube from the gas valve and unscrew the off set connector (small blue threaded tube) and
transfer to the new gas valve.
• Release the gas valve from the venturi by undoing three screws
• Transfer the rubber gasket to the new gas valve.
• Replacement is the reverse.
• Operate the heat engine and check for gas leaks.
• After fi ve minutes check the rate and combustion is correct to the Data table. (
page 8
). Adjust using the
throttle adjustment screw on the gas valve if necessary. Turn clockwise to decrease CO
2
, anti-clockwise to
increase CO
2
(
see 5.2.1 for details)
NB Valve Coil resistances are 2.8k and 1.6k ohms.
6.2.11 AIR INTAKE TUBE AND AIR CONTROL FLAP
• Remove the vacuum air tube from the gas valve.
• Using a pair of pliers, compress the Hose clip and pull hose off venturi.
• Pull other end slowly off the air intake manifold.
• Replacement is the reverse.
Hose Clip
Gas valve vacuum tube
Air control fl ap
Gas valve screws (x3)
Summary of Contents for COMBIflo 100/300
Page 9: ...ANDREWS COMBIflo 7 GB 3 1 GENERAL DIMENSIONS CONNECTIONS 3 0 TECHNICAL DATA ...
Page 12: ...ANDREWS COMBIflo 10 GB 3 4 APPLICATION EXAMPLES Single Heating Circuit Simple ...
Page 13: ...ANDREWS COMBIflo 11 GB Single Heating Circuit Immersion DHW Circulation pump ...
Page 16: ...ANDREWS COMBIflo 14 GB Heating Circuit External 0 10V control ...
Page 17: ...ANDREWS COMBIflo 15 GB BMS INTERNET CONNECTIONS ...
Page 18: ...ANDREWS COMBIflo 16 GB 3 5 WIRING DIAGRAMS PCB 1 ...
Page 19: ...ANDREWS COMBIflo 17 GB PCB 2 3 ...