![andrews COMBIflo 100/300 Installation, Operation And Maintenance Manual Download Page 61](http://html1.mh-extra.com/html/andrews/combiflo-100-300/combiflo-100-300_installation-operation-and-maintenance-manual_2942787061.webp)
ANDREWS COMBIfl o
59
GB
6.2.12 COMBUSTION FAN
• Turn OFF the electricity to the appliance and isolate the gas supply.
• Carefully remove the electrical connectors of the fan, gas valve and ionisation electrode. Secure the wiring
loom out of the work area.
• Disconnect the air snorkel from the main air stack.
• Remove the two venturi screws and remove the four gas valve securing screws. Gently remove the gas
valve and air snorkel assembly and place to one side. Inspect the cork venturi gasket and replace if dam-
aged.
• Undo the top two 8mm fan nuts, but do not completely remove them from their thread. Completely remove
the bottom two 8mm fan nuts and withdraw the fan the heat exchanger door.
• Check the condition of the cork gasket and replace if damaged, before fi tting the new fan.
• Before refi tting the four gas valve securing screws ensure that the black O ring gasket is undamaged and
correctly placed in the recess of the gas isolator cock.
• Replacement is the reverse
• Operate the heat engine and check for gas leaks
• After fi ve minutes check the rate and combustion is correct to the table on page 8. Adjust using the throttle
screw on the gas valve clockwise to decrease CO
2
, anti-clockwise to increase CO
2
if required.
(
see 5.2.1
for details)
CAUTION
Please ensure that the cork gasket between the fan and the venturi is correctly placed before fi xing
the two venturi screws. The top edge of the gasket should be visible between the fan and the ven-
turi (see illustration)
6.2.13 VENTURI
• Follow instructions 6.2.12 above, but do not remove the fan.
• Remove the air snorkel from the venturi by compressing the spring clip with a pair of pump pliers and pull-
ing the hose off
• Separate the gas valve from the venturi by removing the 3 cross head screws.
• Check the condition of the gaskets for damage and replace as necessary. Ensure that gaskets are fi tted to
the new venturi or positioned on the fan before securing the venturi into place (see warning above).
• Replacement is the reverse.
• Operate the heat engine and check for gas leaks.
• After fi ve minutes check the rate and combustion is correct to the table on page 8. Adjust using
the throt-
tle screw on the gas valve clockwise to decrease CO
2
, anti-clockwise to increase CO
2
if required.
(
see
5.2.1 for details)
Electrical connectors
8mm Fan
nuts (x4)
NB: Do not
completely
remove
top nuts
Venturi
screws (x2)
Gas valve
securing
screws (x4)
Air
Snorkel
Gas
isolator
Ionisation
electrode
Gasket visible from top
Summary of Contents for COMBIflo 100/300
Page 9: ...ANDREWS COMBIflo 7 GB 3 1 GENERAL DIMENSIONS CONNECTIONS 3 0 TECHNICAL DATA ...
Page 12: ...ANDREWS COMBIflo 10 GB 3 4 APPLICATION EXAMPLES Single Heating Circuit Simple ...
Page 13: ...ANDREWS COMBIflo 11 GB Single Heating Circuit Immersion DHW Circulation pump ...
Page 16: ...ANDREWS COMBIflo 14 GB Heating Circuit External 0 10V control ...
Page 17: ...ANDREWS COMBIflo 15 GB BMS INTERNET CONNECTIONS ...
Page 18: ...ANDREWS COMBIflo 16 GB 3 5 WIRING DIAGRAMS PCB 1 ...
Page 19: ...ANDREWS COMBIflo 17 GB PCB 2 3 ...