3.
Slide the calibration bucket
2
into the guide rails
1
so that the calibration bucket is positioned
underneath the metering unit.
2
1
CMS-I-00006785
4.
Open the calibration flap
1
.
1
CMS-I-00006787
5.
To start the calibration via the TwinTerminal
1
or the calibration button,
refer to the ISOBUS software operating manual,
"Calibration menu"
or
see "control computer" operating manual.
6.
To start the calibration via the control terminal,
refer to the ISOBUS software operating manual,
"Calibration menu"
or
see "control computer" operating manual.
1
CMS-I-00006860
6 | Preparing the implement
Preparing the implement for operation
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
88