2.
Remove the safety clip
3
.
3.
Slowly lift the soil tillage implement.
The pack top seed drill
1
rests in the catching
sockets
2
of the soil tillage implement.
CMS-I-00003590
4.
Attach the top link
1
with the pin
3
.
5.
Secure the pin with the linch pin
2
.
6.
Place the hydraulic hose lines from the hose
cabinet
6
in the guide
5
.
7.
Place the supply line for the job computer in the
guide.
8.
Fasten the hydraulic hose lines and supply line
with the holder
4
.
CMS-I-00004526
On the CombiDisc compact disc harrow, the top link
is adjusted to a length of 840 mm.
On the KE/KX/KG rotary cultivator with 1-tube roller
frame, the top link is adjusted to a length of 445 mm.
On the KE/KX/KG rotary cultivator with 2-tube roller
frame, the top link is adjusted to a length of 505 mm.
9.
Adjust the top link to the desired length.
CMS-I-00006782
10. Lift the soil tillage implement with the coupled
seed drill.
IMPORTANT
The parking supports do not
have a locking device.
To prevent the parking supports from
falling out of the mount while driving,
remove the parking supports.
11. Remove the parking supports
1
from the
implement
2
on both sides.
1
2
CMS-I-00007204
6 | Preparing the implement
Coupling the implement
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
53