5.
Attach the loading hook
3
.
6.
Install the bolts
4
.
7.
Install the washers
2
.
8.
Install the nuts
1
.
1
2
3
4
CMS-I-00005353
9.
Tighten the nuts
1
.
1
CMS-I-00005354
11.2 Lifting the implement
The implement has three lashing points for slings for
lifting.
WARNING
Risk of accidents due to improperly
attached slings for lifting
If the slings are not attached at the
marked lashing points, the implement can be
damaged during lifting and endanger safety.
Only attach the slings for lifting at the
marked lashing points.
To determine the required load-bearing
capacity of the slings,
observe the specifications in the following
table.
CMS-I-00006855
Required load-bearing capacity per sling
4000 kg
CMS-T-00009837-A.1
11 | Loading the implement
Lifting the implement
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
143