17. Clean the metering housing and the metering
roller.
18.
When the metering housing and the metering
roller have been cleaned,
reinstall the metering roller.
19. Align the catch
4
on the bearing cover
1
with
the drive shaft.
20. Install the bearing cover.
21. Tighten the bolts with the socket wrench
3
.
22. Park the socket wrench in the holder
2
.
3
2
1
4
CMS-I-00005254
23. park the sliding shutter
2
on the metering unit
housing.
24. Swivel the bolts
3
in front of the sliding shutter.
25. Tighten the bolts with the socket wrench
1
.
1
3
2
CMS-I-00005255
26. Close the calibration flap
1
.
1
CMS-I-00006791
10 | Repairing the implement
Maintaining the implement
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
136