3.
Couple the hydraulic hose lines
1
to the
hydraulic sockets of the tractor according to the
marking
2
.
The hydraulic plugs lock perceptibly.
4.
Route the hydraulic hose lines with sufficient
freedom of movement and without chafing points
or pinching points.
1
2
CMS-I-00001045
6.3.4 Coupling the 3-point mounting frame
1.
Set the tractor lower links
1
to the same height.
2.
Couple the lower links
1
from the tractor seat.
3.
Couple the top link
2
.
4.
Check whether the top link catch hooks
3
and
lower link catch hooks
4
are correctly locked.
3
4
2
1
CMS-I-00001225
6.3.5 Coupling the Centaya pack top seed drill
1.
Slowly drive the tractor with the coupled soil
tillage implement
1
under the pack top seed
drill.
The QuickLink pins for the pack top seed drill are
lined up with the QuickLink catching sockets of
the soil tillage implement.
1
CMS-I-00006856
CMS-T-00001400-G.1
CMS-T-00009821-A.1
6 | Preparing the implement
Coupling the implement
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
52