12. Loosen the bolts with the socket wrench
3
.
13. Park the socket wrench in the holder
2
.
14. Turn the bearing cover
1
.
3
2
1
CMS-I-00005253
15. Pull off the bearing cover
2
.
16. Pull the metering roller
1
out of the metering
unit.
17. Install the new metering roller.
1
2
CMS-I-00005256
18. Align the catch
4
on the bearing cover
1
with
the drive shaft.
19. Install the bearing cover.
20. Tighten the bolts with the socket wrench
3
.
21. Park the socket wrench in the holder
2
.
3
2
1
4
CMS-I-00005254
22. park the sliding shutter
2
on the metering unit
housing.
23. Swivel the bolts
3
in front of the sliding shutter.
24. Tighten the bolts with the socket wrench
1
.
1
3
2
CMS-I-00005255
6 | Preparing the implement
Preparing the implement for operation
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
85