AT-x950-28XSQ Switch and VCStack Installation Guide
135
2. Configure the member switch. Refer to “Configuring the Member
3. After configuring both master and member switches, cable the ports of
the stack trunk. Refer to Chapter 9, “Cabling the Networking Ports” on
page 147.
4. Power on the two switches of the stack. Refer to “Powering on the
5. Verifying that the switches formed the stack by referring to “Verifying
6. Cable the networking ports. Refer to Chapter 9, “Cabling the
Summary of Contents for AT-x950-28XSQ
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Page 80: ...Chapter 3 Beginning the Installation 80 ...
Page 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Page 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Page 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Page 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Page 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Page 180: ...Chapter 11 Troubleshooting 180 ...