AT-x950-28XSQ Switch and VCStack Installation Guide
167
4. Press the release lever to the right and pull on the handle to release
the power supply from the internal connector in the switch. Refer to
Figure 98.
Figure 98. Removing the Power Supply
5. Carefully slide the power supply from the switch. Refer to Figure 99 on
Warning
The power supply is heavy. Use both hands to hold it when
removing it from the switch.
Release Lever
Summary of Contents for AT-x950-28XSQ
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Page 80: ...Chapter 3 Beginning the Installation 80 ...
Page 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Page 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Page 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Page 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Page 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Page 180: ...Chapter 11 Troubleshooting 180 ...