AT-x950-28XSQ Switch and VCStack Installation Guide
155
Figure 86. Installing 100Gbps QSFP28 Transceivers in XEM2-1CQ Line
Cards
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 4 to install
additional transceivers.
5. If the fiber optic connector on the transceiver has a dust cover, remove
the cover.
6. Connect the fiber optic cable to the connector on the transceiver. The
cable is keyed such that it can connect to the transceiver only one way.
7. Repeat this procedure to install additional transceivers.
Summary of Contents for AT-x950-28XSQ
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Page 80: ...Chapter 3 Beginning the Installation 80 ...
Page 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Page 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Page 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Page 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Page 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Page 180: ...Chapter 11 Troubleshooting 180 ...