Chapter 8: Configuring Switches for Stacking
134
What to Do Next
After configuring the master switch, do the following:
1. Power off the switch by disconnecting its AC power cords from the AC
power sources. Refer to Figure 79 on page 134.
Figure 79. Powering Off the Switch
4
Check the running configuration of the master switch with the SHOW RUNNING-
CONFIG command for the following commands:
- Four STACK commands.
- Two SWITCH PROVISION commands, with the IDs 1 and 2.
- INTERFACE and STACKPORT commands designating the ports of the stack trunk
for both the provisioned master switch (port1) and the member switch (port2). The
stacking ports here are only an example. Your stacking ports might be different.
awplus# show running-config
.
stack virtual-mac
stack virtual-chassis-id 115
stack enable
stack 1 priority 1
.
switch 1 provision x950-28
switch 2 provision x950-28
.
interface port1.0.33-1.0.37
stackport
.
interface port2.0.33-2.0.37
stackport
5
Go to “What to Do Next” on page 134.
Table 17. Verifying the Master Switch (Continued)
Step
Description and Command
Summary of Contents for AT-x950-28XSQ
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Page 80: ...Chapter 3 Beginning the Installation 80 ...
Page 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Page 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Page 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Page 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Page 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Page 180: ...Chapter 11 Troubleshooting 180 ...