Making Swagelok Connections
A
Agilent Intuvo 9000 GC Installation
95
3
Push the tubing into the stainless steel plug (see
).
Figure 18
Assembling the fitting
4
Make sure that the front ferrule is touching the plug. Slide
the Swagelok nut over the ferrule and thread it onto the plug.
5
Push the tube fully into the plug, then withdraw it
approximately 1 to 2 mm (see
).
Figure 19
Insert the tubing
6
Finger-tighten the nut.
Nut and ferrules
Plug or
fitting held
in vise
Tubing
Front
ferrule
Back
ferrule
Nut
Insert
tubing fully
Withdraw tubing
1-2 mm
Tighten nut
Summary of Contents for Intuvo 9000
Page 1: ...Agilent Technologies Agilent Intuvo 9000 Gas Chromatograph Installation and First Startup...
Page 6: ...6 Agilent Intuvo 9000 GC Installation...
Page 25: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 25 3 Reinstall the GC covers...
Page 27: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 27 Turn on the GC...
Page 29: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 29...
Page 84: ...84 Agilent Intuvo 9000 GC Installation 1 Installing the GC 8 Close the GC front door...
Page 114: ...Agilent Technologies...