Agilent Intuvo 9000 GC Installation
1
Installing the GC
Connect valve actuator air (if present).
Valves are driven by air actuators. Valves should have a
dedicated air source; they cannot share detector air supplies.
Valves can use nitrogen as an alternate supply. In this case, the
nitrogen does not have to be chromatographic grade but must be
free from contaminants.
Valve actuator air is supplied through 1/4-inch plastic tubing. If
your GC was ordered with valves, the plastic tubing will already
be attached to the actuators and will extend from the back of
the GC.
Turn off the air supply at the source. If needed, shorten the
supplied plastic tubing using a sharp knife. Connect the tubing
to the air source using a 1/4-inch Swagelok nut and ferrules.
CAUTION
Do not share air between a detector and valves.
CAUTION
Route the tubing away from the GC hot air exhausts. The hot air will
melt the plastic tubing.
Summary of Contents for Intuvo 9000
Page 1: ...Agilent Technologies Agilent Intuvo 9000 Gas Chromatograph Installation and First Startup...
Page 6: ...6 Agilent Intuvo 9000 GC Installation...
Page 25: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 25 3 Reinstall the GC covers...
Page 27: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 27 Turn on the GC...
Page 29: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 29...
Page 84: ...84 Agilent Intuvo 9000 GC Installation 1 Installing the GC 8 Close the GC front door...
Page 114: ...Agilent Technologies...