Installing the GC
1
Agilent Intuvo 9000 GC Installation
75
column bus fitting should be flat against the bus, and the
inlet flow chip should lay flat against the bus.
h
Figure 14
Click and run fittings
i
Rotate the clips to hold the inlet chip in place.
Figure 15
Place the inlet chip – check your work
j
Insert the inlet chip Smart ID key into the lower socket to
the right of the bus. See
Click and run
ÀWWLQJV
Top of inlet chip
rests in pocket
Inlet chip
Detector chip
Inlet chip routes under wire from
detector chip
Summary of Contents for Intuvo 9000
Page 1: ...Agilent Technologies Agilent Intuvo 9000 Gas Chromatograph Installation and First Startup...
Page 6: ...6 Agilent Intuvo 9000 GC Installation...
Page 25: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 25 3 Reinstall the GC covers...
Page 27: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 27 Turn on the GC...
Page 29: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 29...
Page 84: ...84 Agilent Intuvo 9000 GC Installation 1 Installing the GC 8 Close the GC front door...
Page 114: ...Agilent Technologies...