48
Hardware Installation
Checklists
❏
Gas purifier plumbed and purged
❏
GC plumbed
Configuring the GC
❏
ALS installed (optional)
❏
Merlin Microseal installed (optional)
❏
GC plugged in and turned on
❏
GC passes self-test
❏
Column parameters configured
❏
Carrier gas line pressure set to approximately 60 psi
(414 KPa)
❏
Column flow rate set to 5 mL/min (split flow to 200 mL/min)
Conditioning the column
❏
Free end of column trimmed
❏
Helium flow through column verified
❏
Injection port temperature set to 300 °C
❏
Oven temperature ramped from 40 °C to 300°C at 15 °C per
minute and held for 10 minutes
❏
5 µL of methanol injected into GC; repeated two more times
at 5-minute intervals
❏
Injection port set to 250 °C
❏
GC power off
MSD installation
Preparing the MSD for installation
❏
MSD and foreline pump unpacked and placed on the bench
❏
MSD top cover removed
❏
Vent valve opened to equalize pressure
Summary of Contents for 5973N
Page 1: ...Agilent Technologies 5973N and 5973 inert Mass Selective Detector Hardware Installation ...
Page 6: ...6 Hardware Installation ...
Page 20: ...20 Hardware Installation General Information ...
Page 59: ......
Page 60: ...G2589 90073 Agilent Technologies Agilent Technologies Inc Printed in USA August 2003 ...