![Agilent Technologies 5973N Hardware Installation Download Page 22](http://html.mh-extra.com/html/agilent-technologies/5973n/5973n_hardware-installation_2867264022.webp)
22
Hardware Installation
Installation
Overview
Installing the MSD system includes the following steps:
•
Unpacking and inspecting shipped materials
•
Installing the GC
•
Installing the MSD
•
Installing the computer and peripherals
•
Integrating the GC and MSD
•
Evaluating performance
•
Familiarizing the customer with the system
Installing CI MSD systems requires additional steps:
•
PFDTD calibrant added to calibration vial
•
Methane/isobutane gas purifier installation
•
Methane reagent gas line and gas purifier purge
•
Methane reagent gas line hookup
After system performance has been verified in EI mode, the
MSD must be switched to CI mode and evaluated:
•
CI ion source and CI interface tip seal installation
•
Bakeout and purge at least 2 hours
•
CI setup
•
PCI autotune and sensitivity verification
•
NCI autotune and sensitivity verification
The 59864B vacuum gauge controller is required for CI
operation.
Summary of Contents for 5973N
Page 1: ...Agilent Technologies 5973N and 5973 inert Mass Selective Detector Hardware Installation ...
Page 6: ...6 Hardware Installation ...
Page 20: ...20 Hardware Installation General Information ...
Page 59: ......
Page 60: ...G2589 90073 Agilent Technologies Agilent Technologies Inc Printed in USA August 2003 ...