PFTBA vial for EI cal valve filled
❏
PFDTD vial for CI cal valve filled
Preparing the vacuum system
❏
Plugs removed from the foreline pump
❏
Foreline pump line voltage verified to match available
AC power
❏
Line voltage identification sticker installed on MSD
❏
Oil drip pan under the foreline pump
❏
Foreline hose connected to the pump
❏
Pump exhaust vented to a fume hood or the oil trap installed
❏
Diffusion pump cap removed (diffusion pump MSD only)
❏
Foreline pump power cord plugged into MSD
❏
59864B Gauge Controller installed (required for CI MSDs)
Plumbing the methane line to the CI MSD
❏
Methane/isobutane gas purifier installed
❏
Regulator pressure set to 20 psig (do not exceed 30 psig).
❏
Gas purifier and lines purged
❏
Methane reagent gas lines plumbed to flow module
Connecting the MSD and the GC
❏
GC power turned off
❏
GC/MSD interface heater cable connected
❏
MSD positioned with interface in GC oven
❏
Sideplate thumbscrews loosened completely; analyzer
opened
❏
Column installed in the GC/MSD interface
❏
Remote cable connected between the GC and the MSD
Summary of Contents for 5973N
Page 1: ...Agilent Technologies 5973N and 5973 inert Mass Selective Detector Hardware Installation ...
Page 6: ...6 Hardware Installation ...
Page 20: ...20 Hardware Installation General Information ...
Page 59: ......
Page 60: ...G2589 90073 Agilent Technologies Agilent Technologies Inc Printed in USA August 2003 ...