![Aegis OSC-9200 User Manual Download Page 21](http://html1.mh-extra.com/html/aegis/osc-9200/osc-9200_user-manual_2860410021.webp)
6
Figure 7 Connect to Power Supply
Power-on Inspection
Press the power button at the lower left of the front panel to start the oscilloscope. During the start-
up process, the scope performs a series of self-tests and you can hear the sound of relays switching.
After the self-test is finished, the welcome screen will be displayed.
Connect the Probe
Connect the Probe:
1.
Connect the BNC terminal of the probe to Channel 1’s BNC connector.
2.
Connect the probe tip to the circuit point to be tested and connect the ground alligator clip of
the probe to the circuit ground terminal.
Function Inspection
1.
Press the
Default
button
on the front panel
to restore the oscilloscope to its default configuration.
2.
Connect the ground clip of the probe to the “Ground Terminal” under the probe compensation
signal output terminal (1 in Figure 10).
3.
Touch the probe tip to the “Compensation Signal Output Terminal”.
4.
Press the
Auto Setup
button.
5.
Observe the waveform on the display. If the probe is properly compensated, the display will
show a square waveform as shown in Figure 8:
Summary of Contents for OSC-9200
Page 1: ...AEGIS Shaft Voltage Tester Handheld Digital Oscilloscope AEGIS OSC 9200...
Page 18: ...3 Appearance and Dimensions mm Figure 1 Front View Figure 2 Side view...
Page 44: ...29 Horizontal Control Contents u Horizontal Scale u Horizontal Delay u Roll Mode u Zoom Mode...
Page 56: ...41 Figure 16 x Interpolation Figure 17 Sinx x Interpolation...
Page 60: ...45 Figure 21 With Random Noise Normal Mode Figure 22 With Random Noise Average Mode...
Page 105: ...90...
Page 135: ...120 Figure 75 Integral with Offset...
Page 139: ...124 Figure 77 Measure Pulse Width...
Page 190: ...175 DC Current Measurement AC Current Measurement...