Installation
48/ 122
Powerlift prefabricated pumping station
Pump type
Longitudinal measurement L [cm]
PSD-B-2200
T
Basin
515
PSD-B-2200
T
Basin
505
PSD-B-2200
T
Basin
585
L-AL
L-PL
L-BL
L-AUS
L-AL
L-PL
L-BL
L-AUS
L-AL
L-PL
L-BL
L-AUS
KL-AT-M 200/4/80/D-Ex
48
58
68
147
48
58
68
148
–
–
–
–
KL-AT-M 300/4/80/D-Ex
48
58
68
142
48
58
68
143
–
–
–
–
KL-AT-M 400/4/80/D-Ex
48
58
68
142
48
58
68
143
–
–
–
–
KL-AT-V 400/2/80/D-Ex
48
58
68
140
48
58
68
141
–
–
–
–
KL-AT-V 400/4/100/D-Ex
48
58
68
138
48
58
68
139
–
–
–
–
KL-AT-V 550/2/80/D-Ex
48
58
68
140
48
58
68
141
–
–
–
–
The description is valid for every float switch:
Î
Push the connection cable through the
cable gland, set it to the
longitudinal
measurement
L
and tighten the union
nut of the cable gland as hand-tight.
L
Î
Lift the cover out of the cover frame and
store to the side.
Î
Lower the float switch on the connection
cable into the tank.