Powerlift prefabricated pumping station
Î
Use the pull wire to pull the connection
cable together with the pump connecting
cable through the cable duct up to the
mounting location of the control.
Î
Keep sufficient excess control cable
(approx. 0.5 m), to enable the connection
to the control.
Î
Replace the cover.
Float switch
A maximum of 5 float switches can be installed on the probe holder. The float switch has a
10 m connection cable (clamped and cast on the float switch).
The float switch will be hung on the probe holder. In the as-delivered condition, a float switch and
cable eye are enclosed as loose parts.
IMPORTANT
A float switch must be assembled for every L-AL, L-PL, L-BL and L-AUS switching
point.
Longitudinal measurement L
with combination of float switch with possible pump types
in the various prefabricated pumping stations (overview of the prefabricated pumping stations
Chapter 6.1 “Prefabricated pumping station”):
Powerlift PSD-P-1000 and PSD-B-1000
Pump type
Longitudinal measurement L [cm]
PSD-P-1000
T
Basin
685
PSD-P-1000
T
Basin
480
PSD-P-1000
T
Basin
1070
L-AL
L-PL
L-BL
L-AUS
L-AL
L-PL
L-BL
L-AUS
L-AL
L-PL
L-BL
L-AUS
SAT-100/D
31
41
51
96
32
42
52
117
32
37
42
58
SAT-150/D
31
41
51
96
32
42
52
117
32
37
42
58
SAT-200/D
31
41
51
96
32
42
52
117
32
37
42
58
SAT-50/2/32/D
31
41
51
96
32
42
52
117
32
37
42
58
SAT-75/2/32/D
31
41
51
96
32
42
52
117
32
37
42
58
SAT-V 75/2/50/D
31
41
51
91
32
42
52
112
32
37
42
53
SAT-V 150/2/50/D
31
41
51
91
32
42
52
112
32
37
42
53
SITA 150 N-ex
31
41
51
94
32
42
52
115
32
37
42
56
SITA 200 N-ex
31
41
51
94
32
42
52
115
32
37
42
56
SITA 300 N-ex
31
41
51
85
32
42
52
106
32
34
36
47
SITA 550 N-ex
31
41
51
78
32
42
52
99
32
34
36
40