background image

Installation

45/ 122

Powerlift prefabricated pumping station

Closed back pressure bell

The closed back pressure bell with 40 m control cable will be assembled on the probe bracket.

 

Î

Lift the cover out of the cover frame and 
store to the side.

 

Î

Lower the closed back pressure bell in 
the tank.

 

Î

Insert the chain through the drill hole (

of the probe bracket (1).

 

Î

Adjust the back pressure bell to 

distance measurement

  

25 cm

 to the tank base (2).

 

Î

Fix the chain with the shackle on the 
probe bracket (3).

25 cm

25 cm

2.

1.

3.

 

Î

Guide the control cable into the recess 
(

) of the probe bracket (1).

 

Î

Pull the control cable through by means 
of a PG screw and fix it with a PG screw 
on the probe bracket (2).

1.

2.

Summary of Contents for Powerlift Concrete

Page 1: ...end user and keep them until the end of the product s life ACO Civil Engineering Issued 2019 09 26 V1 0_DE Original Instructions For non faecal and faecal wastewater for installation in the ground Po...

Page 2: ...67 service aco com Target group The target group for these operating instructions is technically trained skilled personnel The personnel must have the appropriate qualifications Chapter 1 3 Personnel...

Page 3: ...n works 22 3 3 Earthworks 24 3 3 1 Specifications 24 3 3 2 Digging the excavation 25 3 3 3 Installing the container in the basic shaft 25 3 3 4 Installing shaft components with PSD P 26 3 3 5 Installi...

Page 4: ...1 MultiControl Duo control 61 4 1 1 Controls and display elements 61 4 1 2 Menu items and settings 63 4 1 3 Changing the settings 65 4 2 Level Control PS 2 Control System 65 4 2 1 Controls and display...

Page 5: ...nd SAT Q 550 80 4 D 103 6 2 6 SAT Q 1000 100 D SAT Q 1000 100 4 D and SAT Q 1500 100 D 105 6 2 7 LW KP 1325 421 LW KP 1325 422 LW KP 1325 423 and LW KP 1325 424 107 6 3 Submersible pumps faeces contai...

Page 6: ...the requirements of the employers liability insurance association The prefabricated pumping station is intended for installation in the ground below the backflow level in the following types of proje...

Page 7: ...tion Skilled people Installation fixing and connection of pipes Electrical installation Electrician Work on electrical connections to power supply must be carried out by qualified electricians only Op...

Page 8: ...ects and infections A safety helmet protects against head injuries e g in case of falling objects or knocks in the event of low room heights Safety glasses and goggles protect eyes from infections esp...

Page 9: ...least 2 trial runs Controlling the prefabricated pumping station e g unusual running noises of pumps Controlling the readiness of the prefabricated pumping station for operation on the control system...

Page 10: ...llation site If transporting the unit parts using a crane or crane hook Comply with the accident prevention regulations Check the working load limit of the crane and the slings Never stand under the s...

Page 11: ...60 4 50 m Easy accessibility for maintenance work Use of different level sensors by means of universal probe holder Selected material combinations for longer service life Base shaft tank made of high...

Page 12: ...on Universal special bracket made from stainless steel Inlet DN OD 160 200 315 and or 400 Connection pressure pipe DN OD 63 PSD P 1000 and PSD B 1000 and or flange connection DN 100 PSD B 1500 DN 125...

Page 13: ...17 7 m Delivery performance from 1 8 to 47 m h Submersible pumps 10 m connection cable with assembled coupling piece for faecal containing wastewater Delivery head from 1 5 to 47 m Delivery performanc...

Page 14: ...up to the chain holder per metre Rechargeable battery Control 12 V 1 2 aH for retaining the alarm signal in case of power failure Sealing plug All For sealing vapour proof the connection of the cable...

Page 15: ...kW power Furthermore 5 relay contacts are available for the output of fault signals and messages The operation and setting is very simple All values can be queried on the LCD display LCD plain text d...

Page 16: ...ed start switch on delay Internal acoustic alarm Collective fault signal potential free Flood alarm potential free Number of pump starts memory Operating hours counter Input for high water float switc...

Page 17: ...propylene housing 10 m connecting cable Level probe All 4 20 mA output signal for hydrostatic filling level measurement in water and wastewater Very easy to clean and is ideally suited for waste water...

Page 18: ...te reserve cable conduit connection 6 Collar seal connection provided by customer for ventilation pipe 7 Probe holder 8 Access ladder 9 Flushing connection optional 10 Compression fitting and or flang...

Page 19: ...PSD P 1000 PSD B 1500 and 2200 arranged in the tank Not applicable for PSD P 1000 PSD B 1500 and 2200 2 3 Operating principle Wastewater from the connected sanitary appliances flows via the inlet pip...

Page 20: ...o the tank If the water level falls to the pump OFF OFF level then the pump switches off With a set after running period ARP the pump remains activated and the water level continues to be lowered to t...

Page 21: ...fications of personnel Chapter 1 3 Personnel qualifications 3 1 Installation example schematic diagram The example shows the installation of a prefabricated pumping station for draining a car park The...

Page 22: ...excavation 3 3 11 3 Installing shaft components with PSD P Installing shaft components with PSD B 3 3 4 3 3 5 4 Assembling the chain holder and guide pipe 3 4 2 5 Installation in the outdoor cabinet o...

Page 23: ...Installation 23 122 Powerlift prefabricated pumping station Item Work Description Chapter 13 Laying and connecting the on site ventilation pipe 3 3 7 Execute leak test 3 3 12...

Page 24: ...not provide a reinforcement plan and that the calculation as well as an associated reinforcement plan must be inspected and approved by a structural engineer client s obligation We would be pleased to...

Page 25: ...m long strands made from chain or cables with shaft jaws 3 3 2 Digging the excavation Requirement Excavation pits should have a diameter of at least 1 500 mm larger than the external diameter of the b...

Page 26: ...base shaft and circumferential collar base of the shaft ring must be machined e g with angle grinder and grinding disc in order to obtain a release agent free adhesive surface Adhesive surfaces must b...

Page 27: ...heights from 250 to 1 000 mm can be optionally purchased from ACO Arrange the shaft ring centrally e g above the tank position and fit as plumb and allow to slide on Press carefully if there is any c...

Page 28: ...Cover IMPORTANT Before the cover is installed the excavation fit must be backfilled up to this level Chapter 3 3 11 Backfill pit Release and approval for traffic is only permitted after an adequate b...

Page 29: ...the tank Should the mechanical seal slip out of place e g during transportation or on site then this should be tightened again as follows On cold days pre heat the sealing e g construction tank Clean...

Page 30: ...ngs Manhole rings with nominal size 1 000 1 500 and or 2 200 according to DIN 4034 1 can be installed between the manhole ring and connection collars and or tank and cover plate to adapt the installat...

Page 31: ...ively use non shrinking shaft grouting mortar e g Ebralit or equivalent In doing so the manufacturer s processing instructions must be complied with Clean and moisten the sliding rebate and the unders...

Page 32: ...tank with a gradient of at least 1 5 2 Reverse gradients and the formation of siphons or pockets are not allowed Select material that is resistant to the wastewater e g KML PP PE PVC Use acid free lub...

Page 33: ...ack cross section Do not use pipe bends with angles larger than 30 Lay a high quality pull wire in the reserve conduit directly at the same time Choose resistant material e g KML PP PE PVC Use acid fr...

Page 34: ...Installation 34 122 Powerlift prefabricated pumping station Connect the pressure pipe stress free...

Page 35: ...tools suitable for plastic compression fittings Pressure pipe DN 100 DN 125 DIN 200 and or DN 250 Flange connection dimension according to DIN 2501 PN 16 A seal is adhered on the flange in the as deli...

Page 36: ...ensation An outdoor cabinet for accommodating the control flashing light horn etc can be purchased from ACO as an optional product In general components such as the control are already pre installed i...

Page 37: ...outdoor cabinet as a backflow loop 4 Backfill the excavated hole 4 3 2 1 3 3 11 Backfilling the excavation Specifications The construction materials utilised and installation method must never cause a...

Page 38: ...ntry IMPORTANT Leak tests must be executed on the whole plant by a specialist company before backfilling the excavation pit Additional weights must be evenly positioned directly on the cover plate Det...

Page 39: ...the cover plate Fasten the chain holder on the marked position 3 4 3 Installing the submersible pumps Submersible pumps with assembled coupling pieces are integral parts of the basic equipment and mus...

Page 40: ...rgised until it reaches the chain holder Place the loop around the cable eye and fasten with cable tie Hang the cable eye on the chain holder Use the pull wire in order to pull the connecting cable to...

Page 41: ...or the control cable in the reserve cable conduit to be sealed vapour proof Open the required drill holes in the sealing plug and insert the connection cable or control cable through them Fill the en...

Page 42: ...SD B 2200 PSD B 2200 PSD B 2200 TBasin 395 TBasin 795 TBasin 515 TBasin 505 TBasin 585 SAT Q 300 65 D 114 74 150 151 SAT Q 300 80 D 114 74 150 151 SAT Q 400 65 D 107 67 143 144 SAT Q 400 80 D 107 67 1...

Page 43: ...ghten the union nut of the cable gland as hand tight L Lift the cover out of the cover frame and store to the side Lower the back pressure bell on the control cable into the tank Guide the control cab...

Page 44: ...e mounting location of the control Keep sufficient excess control cable approx 0 5 m to enable the connection to the control IMPORTANT Pull the control cable back out of the blank pipe by a small amou...

Page 45: ...de Lower the closed back pressure bell in the tank Insert the chain through the drill hole of the probe bracket 1 Adjust the back pressure bell to distance measurement 25 cm to the tank base 2 Fix the...

Page 46: ...combination of float switch with possible pump types in the various prefabricated pumping stations overview of the prefabricated pumping stations Chapter 6 1 Prefabricated pumping station Powerlift PS...

Page 47: ...4 100 D Ex 36 46 56 102 36 46 56 62 KL AT V 550 2 80 D Ex 36 46 56 104 36 46 56 64 Powerlift PSD B 2200 Pump type Longitudinal measurement L cm PSD B 2200 TBasin 515 PSD B 2200 TBasin 505 PSD B 2200...

Page 48: ...8 143 KL AT M 400 4 80 D Ex 48 58 68 142 48 58 68 143 KL AT V 400 2 80 D Ex 48 58 68 140 48 58 68 141 KL AT V 400 4 100 D Ex 48 58 68 138 48 58 68 139 KL AT V 550 2 80 D Ex 48 58 68 140 48 58 68 141 T...

Page 49: ...it reaches the chain holder Place the loop around the cable eye and fasten with cable tie Hang the cable eye on the chain holder Utilise the pull wire to pull the connecting cable together with the p...

Page 50: ...nd PSD B 1000 Pump type Longitudinal measurement L cm PSD P 1000 PSD B 1000 PSD B 1000 TBasin 685 TBasin 480 TBasin 1070 SAT 100 D 94 115 56 SAT 150 D 94 115 56 SAT 200 D 94 115 56 SAT 50 2 32 D 94 11...

Page 51: ...104 64 140 141 LW KP 1325 421 168 LW KP 1325 422 168 LW KP 1325 423 168 LW KP 1325 424 168 KL AT M 200 4 80 D Ex 109 69 145 146 KL AT M 300 4 80 D Ex 104 64 140 141 KL AT M 400 4 80 D Ex 104 64 140 14...

Page 52: ...protective pipe 20 20 Lift the cover out of the cover frame and store to the side Lower the protective pipe with level probe unit on the protective pipe into the tank Guide the protective pipe into th...

Page 53: ...and fasten with cable tie Hang the cable eye on the chain holder Utilise the pull wire to pull the connecting cable together with the pump connecting cable through the cable duct up to the assembly lo...

Page 54: ...ered on site The MultiControl Duo control and or LevelControl PS2 ControlSystem air bubble injection outside cabinet and Ex barrier can be optionally purchased from ACO 3 5 1 Overview of the electrica...

Page 55: ...MultiControl Duo Control 400 mm x 400 mm Width x Height Level Control PS 2 Control System Dimensions as project related on request Select the maximum spacing according to the lengths of the connection...

Page 56: ...RTANT Utilise a suitable material for the connection of cable extensions e g cast resin or gel collars Cable extension for pumps standard length 10 m Always calculate the required cable cross section...

Page 57: ...Installation 57 122 Powerlift prefabricated pumping station electronics...

Page 58: ...he rotational direction Switch on pump and switch off again immediately Observe the starting recoil carefully from the motor side 1 2 3 5 8 Connecting the control cable optional IMPORTANT To prevent m...

Page 59: ...lug Requirement Flood proof and free wall surface of 100 mm x 200 mm Width x Height near the control unit Connecting the mini compressor to the power supply Note when executing the electrical installa...

Page 60: ...ush the hose end 3 onto the other hose bush of the spring check valve 6 and fix using a hose clamp 4 Push the other end of the hose 2 over the retainer 1 of the mini compressor 13 13 2 1 3 4 5 6 7 8 9...

Page 61: ...betrieb Hochwasser Alarm MultiControl Duo Auswahl Quittung HAND 0 AUTO Pumpe 1 Pumpe 2 10 9 8 7 1 2 3 4 5 6 1 Display panel 2 Rotary knob Select menu items 3 Button Manual mode AN P1 and or P2 4 Butto...

Page 62: ...l switching Manual operation is switched off automatically after 2 minutes 0 Switch off operation The buttons for Pump P1 and P2 are used to switch off automatic mode or manual operation of the pumps...

Page 63: ...eriod 0 60 minutes The value zero deactivates this function If a value of 1 60 min is set the pump is switched off if it runs for longer than the set value without interruption The pump does not start...

Page 64: ...is activated Is switched off no bimetal contact alarm contact is connected to terminal 38 39 pump 2 Rotating field malfunction Is switched off Is activated Is activated In the event of incorrect phase...

Page 65: ...can be displayed but not changed Procedure Turn the Display rotary knob until the required menu item is displayed Press the Acknowledge selection button The most recently saved setting begins to flash...

Page 66: ...The button is used to save the settings made in the menu items MANUAL Switch on manual operation The buttons for Pump P1 and P2 are used to switch on the pumps independently of the level switching Ma...

Page 67: ...ow menu item Bottom row settings Explanation Base load ON 0 200 500 cm The value determines the switching on point of the first pump Base load OFF 0 200 500 cm The value determines the switching off p...

Page 68: ...vated Is switched off no bimetal contact alarm contact is connected to terminal 06 07 Pump 2 ATEX mode Is switched off is activated Is activated If the level sensing does not determine any liquid the...

Page 69: ...saved setting begins to flash Turn the rotary Display knob to change the setting fast turning for a rough setting slow turning for a fine setting Press the Acknowledge selection button to save the se...

Page 70: ...N ex 78 68 58 11 98 88 78 20 78 68 58 11 SITA 300 N ex 69 59 49 11 98 88 78 29 69 59 49 11 SITA 550 N ex 62 52 42 11 98 88 78 36 62 52 42 11 After running period s 0 0 0 0 Maximum current 1 Maximum cu...

Page 71: ...SITA 200 N ex 99 89 79 11 119 109 99 20 99 89 79 11 SITA 300 N ex 90 80 70 11 119 109 99 29 90 80 70 11 SITA 550 N ex 83 73 63 11 119 109 99 36 83 73 63 11 After running period s 0 0 0 0 Maximum curr...

Page 72: ...00 N ex 40 30 20 11 60 50 40 11 40 30 20 11 SITA 300 N ex 31 29 27 5 60 50 40 11 31 29 27 5 SITA 550 N ex 24 22 20 5 60 50 40 11 24 22 20 5 After running period s 0 0 0 0 Maximum current 1 Maximum cur...

Page 73: ...4 64 11 125 115 105 41 84 74 64 11 KL AT V 400 4 100 D Ex 82 72 62 11 125 115 105 43 82 72 62 11 KL AT V 550 2 80 D Ex 84 74 64 11 125 115 105 41 84 74 64 11 After running period s 0 0 0 0 Maximum cur...

Page 74: ...85 75 65 41 44 34 24 11 KL AT V 400 4 100 D Ex 42 32 22 11 85 75 65 43 42 32 22 11 KL AT V 550 2 80 D Ex 44 34 24 11 85 75 65 41 44 34 24 11 After running period s 0 0 0 0 Maximum current 1 Maximum cu...

Page 75: ...149 139 129 44 105 95 85 11 SAT Q 300 80 4 D 110 100 90 11 149 139 129 39 110 100 90 11 KL AT M 200 4 80 D Ex 115 105 95 11 149 139 129 34 115 105 95 11 KL AT M 300 4 80 D Ex 110 100 90 11 149 139 129...

Page 76: ...FF cm SAT Q 300 65 D 119 109 99 11 150 140 130 31 119 109 99 11 SAT Q 300 80 D 119 109 99 11 150 140 130 31 119 109 99 11 SAT Q 400 65 D 112 102 92 11 150 140 130 38 112 102 92 11 SAT Q 400 80 D 112 1...

Page 77: ...5 8 KL AT M 200 4 80 D Ex 4 1 KL AT M 300 4 80 D Ex 5 8 KL AT M 400 4 80 D Ex 7 3 KL AT V 400 2 80 D Ex 6 7 KL AT V 400 4 100 D Ex 7 3 KL AT V 550 2 80 D Ex 8 7 Level control Internal converter Float...

Page 78: ...424 130 120 110 11 180 170 160 49 130 120 110 11 After running period s 0 0 0 0 Maximum current 1 Maximum current 2 LW KP 1325 421 27 LW KP 1325 422 23 LW KP 1325 423 23 LW KP 1325 424 20 Level contr...

Page 79: ...wing table by hand Menu item Unit Pump type Settings with level sensor A B C D E Base load ON cm Base load OFF cm Peak load ON cm Flood AL cm After running period s 0 0 0 0 Maximum current 1 Maximum c...

Page 80: ...vented during the initial start up It can be filled with drinking water rainwater or process water when this complies with the local discharge conditions for effluent Lift the cover out of the cover...

Page 81: ...ollowing Perform the trial run at least twice during commissioning Perform the trial run with drinking water rainwater or process water if it meets the local discharge conditions for effluent Avoid dr...

Page 82: ...Commissioning 82 122 Powerlift prefabricated pumping station Requirement for design with open back pressure bell without air bubble injection...

Page 83: ...the inlet BL When the water reaches the OFF level Pump 1 switches off IMPORTANTWith a combination of open back pressure bell without air bubble injection Switch on Pump 1 manually measure the time un...

Page 84: ...period OFF and or ARP OFF Terminating automatic mode Press both buttons in order to end automatic mode of Pump 1 and 2 Anzeige St rung Pumpe 1 Pumpe 2 Betrieb Nachlauf Automatik Handbetrieb Hochwasser...

Page 85: ...tional Set air bubble injection on the mini compressor Chapter 4 6 Setting air bubble injection optional Document the settings Chapter 4 3 Commissioning settings Document the commissioning Appendix Co...

Page 86: ...contact with wastewater and wear protective equipment Chapter 1 4 Personal protective equipment Do not carry out work on the connections and pipes unless they are depressurised Burns due to hot surfac...

Page 87: ...is defective Exchange the level probe Float switch is defective Exchange the float switch es Knocking noises vibrations in the pressure pipe on switching off the pump s After running period of the pum...

Page 88: ...G PSD B 2200 TBasin 505 I PSD B 2200 TBasin 585 Model Dimensions mm D1 D2 nxD3 H1 H2 H3 H4 HMax TBasin T OD1 DN2 A 1 000 1 240 1x800 1 345 1 480 0 190 4 500 685 1 000 160 50 B 1 000 1 240 1x800 1 585...

Page 89: ...t For connecting pipe OD 63 mm Flange connection with flange connection dimension according to DIN 2501 PN 16 6 1 2 Key data Prefabricated pumping station Useful vol ume Weight Model Manhole base sect...

Page 90: ...mp motor operating voltage V 400 400 400 Frequency Hz 50 50 50 Pump motor speed 1 min 2 700 2 665 2 740 Pump motor power input P1 kW 1 3 1 6 2 0 Pump motor output P2 kW 0 9 1 1 1 5 Pump motor nominal...

Page 91: ...ram SAT 100 D Application range Head Q m h 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 H m 1 6 2 2 4 2 8 3 2 3 6 4 4 4 4 8 5 2 5 6 6 6 4 6 8 7 2 7 6 8 8 4 8 8 9 2 9 6 10 10 4 10 8 11 2 11 6 12 12...

Page 92: ...150 D Application range Head Q m h 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 H m 1 1 5 2 2 5 3 3 5 4 4 5 5 5 5 6 6 5 7 7 5 8 8 5 9 9 5 10 10 5 11 11 5 12 12 5 13 13 5 14 14 5 15...

Page 93: ...SAT 200 D Application range Head 0 4 8 12 16 20 24 28 32 36 40 44 48 H m 0 5 1 1 5 2 2 5 3 3 5 4 4 5 5 5 5 6 6 5 7 7 5 8 8 5 9 9 5 10 10 5 11 11 5 12 12 5 13 13 5 14 14 5 15 15 5 16 16 5 17 17 5 18 18...

Page 94: ...4G1 Pump motor operating voltage V 400 400 Frequency Hz 50 50 Pump motor speed 1 min 2 830 2 830 Pump motor power input P1 kW 0 7 0 8 Pump motor output P2 kW 0 4 0 6 Pump motor nominal current A 1 1 1...

Page 95: ...ram SAT 50 2 32 D Head Q m h 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 H m 0 8 1 1 2 1 4 1 6 1 8 2 2 2 2 4 2 6 2 8 3 3 2 3 4 3 6 3 8 4 4 2 4 4 4 6 4 8 5 5 2 5 4 5 6 5 8 6 6 2 6 4 6 6 6 8 7 7 2 7 4 7 6...

Page 96: ...D Application range Head Q m h 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 H m 0 0 4 0 8 1 2 1 6 2 2 4 2 8 3 2 3 6 4 4 4 4 8 5 2 5 6 6 6 4 6 8 7 2 7 6 8 8 4 8 8 9 2 9 6 10 10 4 10 8 11...

Page 97: ...4G1 4G1 Pump motor operating voltage V 400 400 Frequency Hz 50 50 Pump motor speed 1 min 2 830 2 642 Pump motor power input P1 kW 0 7 1 5 Pump motor output P2 kW 0 6 1 1 Pump motor nominal current A 1...

Page 98: ...on range Head Q m h 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 H m 0 6 0 8 1 1 2 1 4 1 6 1 8 2 2 2 2 4 2 6 2 8 3 3 2 3 4 3 6 3 8 4 4 2 4 4 4 6 4 8 5 5 2 5 4 5 6 5 8 6 6 2 6 4 6 6...

Page 99: ...plication range Head Q m h 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 H m 0 8 1 2 1 6 2 2 4 2 8 3 2 3 6 4 4 4 4 8 5 2 5 6 6 6 4 6 8 7 2 7 6 8 8 4 8 8 9 2 9 6 10 10 4 10 8 11 2 11 6 12 12 4...

Page 100: ...400 400 400 400 400 Frequency Hz 50 50 50 50 50 Pump motor speed 1 min 2 835 2 835 2 842 2 842 2 868 Pump motor power input P1 kW 2 9 2 9 4 0 4 0 10 0 Pump motor output P2 kW 2 2 2 2 3 0 3 0 7 5 Pump...

Page 101: ...14 15 16 17 18 19 20 Q m h 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 DRN 300 2 65 A1DT5 SAT Q 300 65 D Anwendungsbereich Performance diagram SAT Q 300 80 D Eff 65 8 Application range Head H...

Page 102: ...3 14 15 16 17 Q m h 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 DRN 400 2 65 A1FT5 SAT Q 400 65 D Anwendungsbereich Performance diagram SAT Q 400 80 D Eff 51 1 Application range Head H m...

Page 103: ...acteristic data and use limits Key data SAT Q 300 80 4 D 550 80 4 D Type of cable for connection cable 4G1 5 3x1 4G2 5 3x1 Pump motor operating voltage V 400 400 Frequency Hz 50 50 Pump motor speed 1...

Page 104: ...5 4 4 5 5 5 5 6 6 5 7 7 5 8 8 5 9 9 5 10 Q m h 0 10 20 30 40 50 60 70 80 90 100 110 120 DRN 300 4 80 A1FT5 SAT Q 300 80 4 D Anwendungsbereich Performance diagram SAT Q 550 80 4 D Eff 53 2 Application...

Page 105: ...W 13 6 11 5 19 0 Pump motor output P2 kW 10 8 8 9 16 1 Pump motor nominal current A 21 6 20 0 28 8 Maximum starts per hour 30 30 30 Maximum ball through flow and or through flow mm 80 x 75 95 x 80 80...

Page 106: ...14 15 16 17 18 19 Q m h 0 20 40 60 80 100 120 140 160 180 200 220 240 260 DRP 1000 4 100 A0HT5 SAT Q 1000 100 4 D Anwendungsbereich Performance diagram SAT Q 1500 100 D Eff 52 Application range Head H...

Page 107: ...2x1 5 7G2 5 2x1 5 7G2 5 2x1 5 Pump motor operating voltage V 400 400 400 400 Frequency Hz 50 50 50 50 Pump motor speed 1 min 1 455 1 465 1 465 1 470 Pump motor power input P1 kW 15 6 12 5 12 5 10 2 P...

Page 108: ...tion Performance diagram LW KP 1325 421 H m Q l s 0 10 20 30 40 50 60 70 80 90 100 110 120 0 2 4 6 8 10 12 14 16 18 20 22 LW KP 1325 421 Performance diagram LW KP 1325 422 H m Q l s 0 10 20 30 40 50 6...

Page 109: ...umping station Performance diagram LW KP 1325 423 H m Q l s 0 10 20 30 40 50 60 70 80 90 100 0 2 4 6 8 10 12 14 16 18 LW KP 1325 423 Performance diagram LW KP 1325 424 H m Q l s 0 10 20 30 40 50 60 70...

Page 110: ...onnection cable 4G1 5 2x0 75 4G2 5 2x0 75 4G2 5 2x0 75 Pump motor operating voltage V 400 400 400 Frequency Hz 50 50 50 Pump motor speed 1 min 1 405 1 428 1 425 Pump motor power input P1 kW 2 0 2 9 3...

Page 111: ...400 4 80 Weight kg 66 86 89 Performance diagram KL AT M 200 4 80 D Ex Eff 64 7 Application range Head H m 1 1 5 2 2 5 3 3 5 4 4 5 5 5 5 6 6 5 7 7 5 8 8 5 9 9 5 10 Q m h 0 5 10 15 20 25 30 35 40 45 50...

Page 112: ...11 12 13 14 Q m h 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 MAN 300 4 80 A1FT5 Anwendungsbereich KL AT M 300 4 80 D Ex Performance diagram KL AT M 400 4 80 D Ex Eff 75 8 Application range Head...

Page 113: ...1 425 2 880 Pump motor power input P1 kW 4 0 3 7 5 0 Pump motor output P2 kW 3 0 3 0 4 1 Pump motor nominal current A 6 7 7 3 8 7 Maximum starts per hour 30 30 30 Maximum ball through flow mm 80 100...

Page 114: ...m h 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 DGN 400 4 100 A1FT5 KL AT V 400 4 100 D Ex Anwendungsbereich Performance diagram KL AT V 550 2 80 D Ex Eff 32 1 Applic...

Page 115: ...2 835 2 880 Pump motor power input P1 kW 1 53 2 1 2 9 5 0 Pump motor output P2 kW 1 10 1 5 2 2 4 1 Pump motor nominal current A 2 9 3 7 5 1 8 7 Maximum starts per hour 20 20 30 30 Medium temperature r...

Page 116: ...8 19 20 21 22 23 Q m h 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 GRF 200 2 G40H A1CT5 SITA 200 N Ex Anwendungsbereich Performance diagram SITA 300 N ex Eff 55 9 Application range H...

Page 117: ...rol 6 4 1 Key data Key data Values Operating voltage 400 V L1 L2 L3 N PE 50 Hz Control voltage 230 VAC 50 Hz Motor current limitation 0 3 A to 12 A with duo adjustable for each pump Power intake conta...

Page 118: ...Technical Data 118 122 Powerlift prefabricated pumping station 6 4 2 Circuit diagram MultiControl Duover 1 19 20 Relaisausg nge und Signaleing nge...

Page 119: ...rent limitation 0 3 A to 12 A with duo adjustable for each pump Power intake contactors operated 20 VA Connected load maximum P2 5 5 kW Protection type controller IP 54 Isolated alarm contact 3 A Fuse...

Page 120: ...in 685 PSD B 1000 TBasin 480 PSD B 1000 TBasin 1 070 PSD B 1500 TBasin 395 PSD B 1500 TBasin 795 PSD B 2200 TBasin 515 PSD B 2200 TBasin 505 PSD B 2200 TBasin 585 SAT SA V SAT Q LW KP 1325 KL AT M KL...

Page 121: ...sure pipe Function testing actuation leak tightness Ball valve and or gate valve in the pressure pipe function test actuation open position leak tightness Fixing of the pressure pipe Switching and set...

Page 122: ...ACO Tiefbau Vertrieb GmbH Am Ahlmannkai D 24782 B delsdorf Tel 49 4331 354 500 Fax 49 4331 354 358 www aco tiefbau de ACO creating the future of drainage ACO Civil Engineering...

Reviews: