Commissioning
75/ 122
Powerlift prefabricated pumping station
4.3.6 Powerlift PSD-B-2200 with T
Basin
= 515
Menu
point
Unit
Pump type
Settings with level sensor:
A
+
B
C
D
E
AL
PL
BL
OFF
AL
PL
BL
OFF
AL
*
PL
*
BL
*
OFF
*
Flood AL
=
AL
Peak load
ON =
SL
Base load
ON =
BL
Base load
OFF =
OFF
cm
SAT-Q 300/65/D
118 108 98 11 149 139 129 31
–
118 108 98 11
SAT-Q 300/80/D
118 108 98 11 149 139 129 31
118 108 98 11
SAT-Q 400/65/D
111 101 91 11 149 139 129 38
111 101 91 11
SAT-Q 400/80/D
111 101 91 11 149 139 129 38
111 101 91 11
SAT-Q 550/80/4/D
110 100 90 11 149 139 129 39
110 100 90 11
SAT-Q 750/80/D
109 99 89 11 149 139 129 40
109 99 89 11
SAT-Q 1000/100/D
105 95 85 11 149 139 129 44
105 95 85 11
SAT-Q 1000/100/4/D
105 95 85 11 149 139 129 44
105 95 85 11
SAT-Q 1500/100/D
105 95 85 11 149 139 129 44
105 95 85 11
SAT-Q 300/80/4/D
110 100 90 11 149 139 129 39
110 100 90 11
KL-AT-M 200/4/80/D-Ex 115 105 95 11 149 139 129 34
115 105 95 11
KL-AT-M 300/4/80/D-Ex 110 100 90 11 149 139 129 39
110 100 90 11
KL-AT-M 400/4/80/D-Ex 110 100 90 11 149 139 129 39
110 100 90 11
KL-AT-V 400/2/80/D-Ex 108 98 88 11 149 139 129 41
108 98 88 11
KL-AT-V 400/4/100/D-
Ex
106 96 86 11 149 139 129 43
106 96 86 11
KL-AT-V 550/2/80/D-Ex 108 98 88 11 149 139 129 41
108 98 88 11
After-running
period
s
0
**
0
0
0
Maximum
current
– 1
***
Maximum
current
– 2
***
A
SAT-Q 300/65/D
5.1
SAT-Q 300/80/D
5.1
SAT-Q 400/65/D
6.7
SAT-Q 400/80/D
6.7
SAT-Q 550/80/4/D
9.0
SAT-Q 750/80/D
15.9
SAT-Q 1000/100/D
21.6
SAT-Q 1000/100/4/D
20.0
SAT-Q 1500/100/D
28.8
SAT-Q 300/80/4/D
5.8
KL-AT-M 200/4/80/D-Ex
4.1
KL-AT-M 300/4/80/D-Ex
5.8
KL-AT-M 400/4/80/D-Ex
7.3
KL-AT-V 400/2/80/D-Ex
6.7
KL-AT-V 400/4/100/D-
Ex
7.3
KL-AT-V 550/2/80/D-Ex
8.7
Level
control
–
Internal converter
Float
switch
4-20mA
interface