Installation
43/ 122
Powerlift prefabricated pumping station
Î
Push the control cable through the
cable gland, set it to the
longitudinal
measurement L
and tighten the union
nut of the cable gland as hand-tight.
L
Î
Lift the cover out of the cover frame and
store to the side.
Î
Lower the back pressure bell on the
control cable into the tank.
Î
Guide the control cable length below the
cable gland into the recess (
●
) of the
probe bracket (1).
Î
Lower the back pressure bell until the
cable gland sits on the probe bracket (2).
1.
2.