Installation
30/ 122
Powerlift prefabricated pumping station
Supporting ring with connection collar (PSD-P-1000, PSD-B-1000 and
-1500)
IMPORTANT
Always pay attention to the desired arrangement with regards to connection for
reserve cable conduit and ventilation pipe.
Î
Arrange the shaft ring centrally above
the tank, fit plumb and allow to slide on.
Press carefully if there is any canting.
Manhole rings
Manhole rings with nominal size 1,000, 1,500 and/or 2,200 according to DIN 4034-1 can
be installed between the manhole ring and connection collars and/or tank and cover plate
to adapt the installation depth. Shaft rings with construction heights from 265 to 2,515
mm can be optionally purchased from ACO.
Î
Arrange the shaft ring centrally above
the tank, fit plumb and allow to slide on.
Press carefully if there is any canting.
Cover plate similar to 4034-1
IMPORTANT
Arrange the cover plate opening as illustrated next to this:
■
Powerlift PSD-P-1000 and PSD-B-1000
■
Powerlift PSD-B-1500 and -2200