Commissioning
85/ 122
Powerlift prefabricated pumping station
Acknowledging a malfunction:
Î
Press the button to acknowledge the
malfunction.
A fault message is no longer displayed and the
LED for the “Flood alarm” goes out.
Auswahl
Quittung
The trial run is finished.
Final work:
■
Position the cover again
■
For version with air bubble injection (optional): Set air bubble injection on the mini
compressor,
Chapter 4.6 “Setting air bubble injection (optional)”
■
Document the settings,
Chapter 4.3 “Commissioning settings”
■
Document the commissioning,
Appendix: “Commissioning report”
4.6 Setting the air bubble injection (optional)
The air outlet of the mini compressor must be adjusted to reduce the volume and power
consumption.
Î
Use the screw on the mini compressor to
set the air bubble injection so that only a
few air bubbles escape at the end of the
back pressure bell (check via inspection
opening).