Technical Data
120/ 122
Powerlift prefabricated pumping station
Appendix: Commissioning report
Commissioning and instruction of a qualified person takes place in the presence of the authorised
acceptance inspection representative and the plant operating company.
Commissioning date:
Handover date:
Powerlift prefabricated pumping station
Prefabricated pumping
station
Submersible pumps
Access
ladder
Accessories
PSD-P-1000/TBasin 685
PSD-B-1000/TBasin 480
PSD-B-1000/TBasin 1,070
PSD-B-1500/TBasin 395
PSD-B-1500/TBasin 795
PSD-B-2200/TBasin 515
PSD-B-2200/TBasin 505
PSD-B-2200/TBasin 585
SA
T ...
SA-V ...
SA
T-Q ...
LW-KP 1325...
KL-A
T-M ...
KL-A
T-V ...
SIT
A ...
Ver
tical ladder
MultiContr
ol Duo contr
ol
Contr
ol Level PS 2 Contr
ol System
Open back pr
essur
e bell
Air bubble injection
Closed back pr
essur
e bell
Float switch
Level pr
obe
Use location
Building/room:
Use:
Detached house Multi-dwelling building Commercial operation
Street:
Town/city:
Responsible persons
Qualified
person
Authorised
acceptance
representative
Plant
operating
company
Name:
Phone No.:
Fax No.:
Email:
Address: