| Installation of the Wallbox eM4 Twin
30
6
Fix the wallbox in place with the remaining screws
supplied.
• Screw the two TX30 half-round head screws
through the upper attachment points in the
mounting rail.
• Screw the two TX30 wafer head screws into the
wall via the lower attachment points.
Electrical connection of the wallbox
DANGER!
Dangerous electrical currents
Electrical connection must be carried out by a qualified specialist electrical contractor!
Ensure also that the power supply cable remains disconnected from the electricity grid.
Deactivate the RCCBs in the wallbox and, if present, in the domestic power distribution.
Proceed as follows to connect the power line inside the wallbox:
1
Shorten the power line to the required length for
the terminal block using side cutters.
2
Remove the sheath from the power line with the
stripping tool.
3
Remove the insulation of the individual conductors
to a length of 16 mm.
• End ferrules must be fitted on flexible
conductors.
16 mm
4
Insert the individual conductors into the terminals
and tighten them using the Phillips screwdriver
(torque: 2.1 Nm).
• Use the connection diagram on the communica-
tion module as a guide to allocate the individual
conductors.
• In a charging group, you will need to modify the
connection diagram to avoid a phase imbalance
(see next section).
L1
L2
L3
N
PE