![ABB RELION Series Engineering Manual Download Page 27](http://html2.mh-extra.com/html/abb/relion-series/relion-series_engineering-manual_3411563027.webp)
2.3
Workflow
Make GOOSE connections
Export SCL files
from PCM 600
Import SCL files to
IET 600
and do
signal engineering
.
Export updated
SCL files from
IET 600
Import SCL files
600
Start
ACT
SMT
PST
GDE
SMT
CMT
ACT
Export
SCD
IET600
Import
SCD
IED
WRITE
End
Configure IED functionality
Parametrization
Signal engineering
Create single line diagram
for local HMI
Save the work
between the
different steps
Project
Create plant structure and
insert IED objects
IEC 61850
DNP3
Modbus
Write configuration to IED
IEC 61850
Configuration tool
to PCM
IEC 60870-5-101/104
GUID-C45BA34E-9036-4AE3-A677-5B9B47168992 V1 EN
Figure 3:
Protection relay engineering workflow proposal based on practical
experience and dependencies of the steps
It is possible to follow a different sequence based on the information available at the
time when the project is started. This means that several iterations may be needed to
complete the project.
Setting up a PCM600 project
•
The plant structure is built according to the substation structure.
The maximum size of a project is 180 IEDs. However, in order to
maintain good performance and usability of the tool, it is
1MRS757810 C
Section 2
Relay engineering process
REC615 and RER615
19
Engineering Manual