later the recommended tool for smaller projects is the IEC 61850 Configuration tool.
For larger projects it is recommended to use IET600, which is available as a
standalone tool.
1.
Create a project in IET600.
[1]
2.
Import the SCD file created by PCM600.
[1]
3.
Conduct vertical communication engineering (monitoring direction).
3.1. Check the default data sets.
3.2. Configure and/or reconfigure the default data sets.
Data sets meant for vertical reporting can only contain
data on the data object level, not on the data attribute level.
The data set for GOOSE can contain signals on the data
attribute or data object level. Data object level GOOSE
entries can only be received of the following CDC types:
SPS, SPC, ACD, ACT, DPS, DPC, INC, INS, ENC and
ENS.
3.3. Configure additional
Report Control Blocks
when needed for each data
set used for vertical communication.
3.4. Link the IED clients to the
Report Control Blocks
.
Up to five report clients can be configured.
4.
Conduct horizontal communication engineering.
4.1. Configure GOOSE control blocks for each data set configured for GOOSE
messages.
One data can be included in the GOOSE data set only once.
4.2. Define the client IEDs for each GOOSE control block.
4.3. Link the IEDs to the GOOSE control block that is to receive the GOOSE
control block.
5.
Export the updated SCD file.
[1]
All data sets,
Report Control Blocks
and GOOSE control
blocks must be located in LLN0.
[1] Applicable when using IET600
1MRS757810 C
Section 7
IEC 61850 communication engineering
REC615 and RER615
121
Engineering Manual