![ABB IRB 6700 Series Product Manual Download Page 454](http://html1.mh-extra.com/html/abb/irb-6700-series/irb-6700-series_product-manual_3662281454.webp)
Note
Action
Dismantle and mounting tool:
3HAC028920-001
xx1300000776
Apply the dismantle and mounting tool and
press in the spherical roller bearing.
8
7
4
J
F
xx1700000379
6
xx1300000775
Refit the o-ring.
7
Loctite 243, 3HAB7116-1
xx1300000774
Apply Locking liquid on the screws and
secure the end cover with the radial sealing
ring.
8
Continues on next page
454
Product manual - IRB 6700
3HAC044266-001 Revision: N
© Copyright 2013 - 2018 ABB. All rights reserved.
4 Repair
4.6.1 Replacing spherical roller bearing, link ear
Continued
Summary of Contents for IRB 6700 Series
Page 1: ...ROBOTICS Product manual IRB 6700 ...
Page 46: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 786: ...This page is intentionally left blank ...
Page 812: ...This page is intentionally left blank ...
Page 836: ...This page is intentionally left blank ...
Page 838: ...This page is intentionally left blank ...
Page 845: ......