![ABB HVC-C 100-150 kW Installation Manual Download Page 34](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984034.webp)
4
Transport
4.1
Transport the EVSE to the site
A transport company delivers the EVSE close to the site. The movement of the EVSE
to its final location is your responsibility.
•
If you need to store the EVSE before installation, obey the ambient conditions
for storage. Refer to section
4.2
Transport the EVSE on the site
4.2.1
General transport procedure
1. Move the power cabinet depending on the available transport method.
• Hoist the power cabinet. Refer to section
• Move the power cabinet with a forklift truck
.
2. Move the boxes to the site.
4.2.2
Hoist the cabinet
Preliminary requirements
1.
The cabinet is unpacked.
Refer to section
8.1
.
•
Hoisting equipment,
including cables, swivel eye
bolts or bolts with lifting
loops. Refer to section
Note:
Risk of pinching or crushing, the cabinet is heavy
•
Make sure that the hoisting equipment can lift the cabinet safely.
Obey the safety instructions that apply to the hoisting equipment.
Take into account the dimensions, the mass and the center of gravity
of the EVSE. Refer to chapter
Caution:
•
Do not drop the cabinet.
•
Do not tilt the cabinet more than allowed. Refer to section
.
Transport
34
6AGA000007-0603-EN | 001