![ABB HVC-C 100-150 kW Installation Manual Download Page 83](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984083.webp)
Procedure
1. Install the covers on the terminals (A).
2. Install the plate (B).
3. Install and tighten the fasteners (C).
18.7
Remove the DC busbar cover
Preliminary requirements
•
Screwdriver, cross
Procedure
1. Remove the fasteners (A).
2. Remove the cover (B).
18.8
Install the DC busbar cover
Preliminary requirements
•
Screwdriver, cross
•
Four fasteners M5
A
B
C
A
B
A
Access to parts
6AGA000007-0611-EN | 001
83