![ABB HVC-C 100-150 kW Installation Manual Download Page 81](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984081.webp)
Procedure
1. Close the door (B).
2. Lock the lock (A) of the door. Use the
door key.
18.3
Remove the border covers of the power cabinet
Preliminary requirements
•
Set of open spanners
Procedure
1. Remove these parts:
•
Fasteners (A)
•
Border covers (B)
18.4
Install the covers
Preliminary requirements
•
Set of open spanners
•
Four nuts with washers M6
(C), four bolts M5 (D)
B
A
B A
B
A
Access to parts
6AGA000007-0611-EN | 001
81