Procedure
1. Drill and thread the holes in the floor
at the positions (A).
2. Make rectangular holes on the
positions (B) and (C). For dimension
specifications, refer to section
.
3. Make sure that the AC power cable
and other cables come out of the floor
at the marked area (B).
4. Make sure that the DC power cables
come out of the floor in the marked
area (C).
A
B
C
Foundations